BIOGAS PURIFICATION PLANT IN TYCHY-URBANOWICE
Status: Completed
Project: Construction of a biogas purification plant at the Tychy-Urbanowice Wastewater Treatment Plant.
Client: Regional Water and Wastewater Management Center SA
Contractor: Varia Tech Sp. z o.o. (leader) in consortium with T4B Sp. z o.o.
Contract Value: 4,4 mln PLN
Completion period: 15.12.2016 r. - 28.02.2018 r.
Scope of work:
• Construction works
• Electrical installations
• Sanitary installations
• Ventilation systems
• Vane compressors
• Carbon dioxide absorbers
• Carbon dioxide desorbers
• Scrubbers
• Commissioning of the main technological equipment
• Construction works
• Electrical installations
• Sanitary installations
• Ventilation systems
• Vane compressors
• Carbon dioxide absorbers
• Carbon dioxide desorbers
• Scrubbers
• Commissioning of the main technological equipment
Additional information:
The project aimed to build a biogas purification plant to optimize the use of biogas as fuel. The plan also included technology for transmitting purified biogas to the Tychy Water Park for use as an energy source.
The project aimed to build a biogas purification plant to optimize the use of biogas as fuel. The plan also included technology for transmitting purified biogas to the Tychy Water Park for use as an energy source.