T4B

T4B Sp. z o.o. executed a subcontract for Mostostal Warszawa, under a contract with ENERGA Elektrownie Ostrołęka S.A., to design and construct an off-mill biomass feeding system for the boilers. T4B’s scope included the prefabrication and connection of local control boxes for equipment, laying cable routes for biomass installations to the boiler house, and installing grounding and lightning protection systems.

Additionally, the contract involved electrical infrastructure installation and construction works, necessary for proper functionality, as well as the performance of measurements, tests, and inspections. T4B also prepared quality documentation and successfully commissioned the system.