ŁUKASIEWICZ RESEARCH NETWORK – INSTITUTE OF NON-FERROUS METALS
Status: Completed
Project: Supply of a medium-voltage switchgear along with an auxiliary switchboard and execution of electrical and sanitary works in the OPT-14 Electrical Station and accompanying rooms, including system commissioning. Ref. no. TM/01/2019
Client: Łukasiewicz Research Network – Institute of Non-Ferrous Metals, Legnica branch
Contractor: T4B sp. z o.o.
Contract Value: 1,1 mln PLN
Completion period: 06.12.2018 r. - 10.12.2019 r.
Scope of work:
• Delivery of an 8-panel medium-voltage switchgear and a 220VDC auxiliary switchboard,
• Execution of internal and external connections for the MV switchgear,
• External and internal connections between the MV switchgear and the 220VDC auxiliary switchboard,
• Connection of the MV switchgear to transformers,
• Connection of transformers to the low-voltage switchboard,
• Installation of lightning protection and grounding systems,
• Execution of measurements and tests,
• Phasing of the MV switchgear and MV cable lines,
• Installation of new MV cable line sections,
• Installation of measurement systems,
• Installation of protection and signaling systems,
• Installation of control systems,
• Commissioning of the MV switchgear, 220VDC auxiliary switchboard, and transformers,
• Preparation of operational manuals for the switchgear.
• Delivery of an 8-panel medium-voltage switchgear and a 220VDC auxiliary switchboard,
• Execution of internal and external connections for the MV switchgear,
• External and internal connections between the MV switchgear and the 220VDC auxiliary switchboard,
• Connection of the MV switchgear to transformers,
• Connection of transformers to the low-voltage switchboard,
• Installation of lightning protection and grounding systems,
• Execution of measurements and tests,
• Phasing of the MV switchgear and MV cable lines,
• Installation of new MV cable line sections,
• Installation of measurement systems,
• Installation of protection and signaling systems,
• Installation of control systems,
• Commissioning of the MV switchgear, 220VDC auxiliary switchboard, and transformers,
• Preparation of operational manuals for the switchgear.
Additional information:
This is not the first project T4B has completed in Legnica for the Institute of Non-Ferrous Metals. In December 2018, our company was commissioned to perform construction work at the aforementioned OPT-14 Electrical Station.
This is not the first project T4B has completed in Legnica for the Institute of Non-Ferrous Metals. In December 2018, our company was commissioned to perform construction work at the aforementioned OPT-14 Electrical Station.