MATERIAL RESERVES AGENCY
Status: Completed
Project: Design and installation of an Integrated Security System for the facilities of the Material Reserves Agency.
Client: Material Reserves Agency
Contractor: T4B sp. z o.o.
Contract Value: 21,5 mln PLN
Completion period: 24.07.2017 r. – 30.06.2020 r.
Scope of work:
• Design of the security system
• Installation and integration of all devices into one integrated system
• Design of the security system
• Installation and integration of all devices into one integrated system
Additional information:
The project was implemented in two stages:
• Stage 1: Development of the security system design
• Stage 2: Installation and integration of all devices into one integrated system.
The project was implemented in two stages:
• Stage 1: Development of the security system design
• Stage 2: Installation and integration of all devices into one integrated system.