As a subcontractor to Budimex SA, T4B completed works on Phase II of the Rail Border Crossing in Terespol and handed over the building for use by the border services.

The scope of work included low-voltage installations such as access control, intrusion and hold-up alarms, CCTV surveillance systems, and fire detection and alarm systems. Additionally, T4B installed a public address system (DSO), structured cabling, a telephone exchange, and radio communication systems. The company also supplied the necessary equipment and materials for an integration system, installed a generator, and mounted primary, emergency, and evacuation lighting. The work was completed in December 2010.