T4B Ltd. signed a contract with Budimex SA for the execution of high and low voltage electrical works as part of the construction of the Road Border Crossing in Dołhobyczów.

The investment covered the installation of electrical and telecommunication systems in the following buildings:

  1. Main building.
  2. Passport and customs pavilions, and border service pavilions.
  3. Shelters W1 and W2A.

The following works were carried out at the aforementioned sites:

Power Networks:

  • Main low voltage switchboard (RGnn), medium voltage switchboard (SN), transformer station, power generator.
  • Internal electrical installations.
  • Outdoor and shelter lighting.
  • De-icing system for the shelter drainage troughs.
  • Barrier (road gate) system.
  • Electrical and telecommunication ducts.

The location and construction of this border crossing are intended to alleviate the burden on the three existing road border crossings in the Lubelskie Voivodeship (Dorohusk–Jagodzin, Zosin–Ustiług, Hrebenne–Rawa Ruska), where T4B also carried out works. The investment includes the installation of electrical and telecommunication systems at the new border crossing between Poland and Ukraine – commented Andrzej Witkowski, Director of the Electrical and Telecommunication Installations Division at T4B.

The Dołhobyczów–Uhrynów Road Border Crossing fills a gap in the border infrastructure along this section of the Polish-Ukrainian border, facilitating the movement of travelers and vehicles, while easing congestion at neighboring crossings, especially in Zosin, where traffic has exceeded capacity by twice the intended limits.

The new border crossing also had significant importance during the Euro 2012 football championships, managing the increased flow of people and vehicles crossing the Polish-Ukrainian border.