The project involved the construction of a complex that includes a 10-story high-rise building and a 6-story mid-rise building, connected by a low-rise 2-story section intended for customer service. T4B was responsible for implementing the electrical and ICT systems, ensuring the office’s infrastructure is fully functional and compliant with safety standards.
TAX OFFICE IN LUBLIN
Status: Completed
Project: Construction of the new Tax Office building in Lublin - electrical and ICT installations.
Scope of work:
• Structured cabling installation,
• Installation and commissioning of a CCTV system,
• Installation of a public address and alarm system,
• Fire alarm system installation,
• Conference room technology installation,
• Electrical installations: medium-voltage station, backup generator, power sockets, lighting.
• Structured cabling installation,
• Installation and commissioning of a CCTV system,
• Installation of a public address and alarm system,
• Fire alarm system installation,
• Conference room technology installation,
• Electrical installations: medium-voltage station, backup generator, power sockets, lighting.