On November 6, 2019, T4B, in collaboration with T4B Ekotechnologie, signed a contract with MPGO Sp. z o.o., headquartered in Sosnowiec.
The project involves the design and construction of a pre-treatment facility for wastewater generated from comprehensive waste management, including biological waste processing and municipal landfill operations.
This will be the fourth pre-treatment facility in Poland based on MBR technology, and the largest to date. For T4B Ekotechnologie, it will be the third such facility built in recent years in cooperation with WEHRLE, a global leader in this field.
The pre-treatment plant will have a capacity of 240 m³/day and will be fully constructed in a lightweight building structure, consisting of enclosed bioreactors (for denitrification and nitrification), a separate system for ultrafiltration and nanofiltration/reverse osmosis, along with an automated rinsing and cleaning system. The design solutions will ensure the reduction of bioaerosol and odor emissions through the application of appropriate technologies.
The technology will be adapted to variable weather conditions and will provide an economical solution for long-term operation.