Project

Regional Infrastructure Authority Lublin

Subject: Preparation of design documentation together with construction works to adapt security support systems to instructional and normative requirements in buildings 1, 2, 16, 18, 19, 146, and 160 in Dęblin, 5 Saperów Street, in a design-and-build formula.

Contracting authority: Regional Infrastructure Authority in Lublin

Regional Infrastructure Authority Lublin

Scope of work:

  • Design documentation,

  • Site development design, building design,

  • Construction and installation works: reconstruction of LCN, TSN, SSP, SA, SKD,

  • Installation of air conditioning,

  • Installation of a backup power source — generator and UPS,

  • Installation of key depositors and key cabinets.

Ver outros projetos

+700 especialistas ao seu dispor!

  • Fornecedor líder de soluções abrangentes de informática, teletecnia, telecomunicações e energia
  • Atuamos em múltiplos setores, incluindo utilidade pública, administração do Estado, defesa nacional, energia, telecomunicações, negócios e engenharia do ambiente
  • Capacidade de conduzir projetos em grande escala, multinível e multifacetados
Contacte-nos
  • Fornecedor líder de soluções abrangentes de informática, teletecnia, telecomunicações e energia
  • Atuamos em múltiplos setores, incluindo utilidade pública, administração do Estado, defesa nacional, energia, telecomunicações, negócios e engenharia do ambiente
  • Capacidade de conduzir projetos em grande escala, multinível e multifacetados
Top