Project

Modernisation of Modlin Airport

T4B, in consortium with Merx, commissioned by Mazowiecki Port Lotniczy Warszawa-Modlin Sp. z o.o., carried out the refurbishment of hangars no. 11 and 12 located at Warsaw/Modlin Airport.

Modernisation of Modlin Airport

Scope of work:

The works were carried out as part of the project entitled “Modernisation of Modlin Airport in order to adapt it to serve low-cost carriers.” The consortium contract value exceeded PLN 10,000,000 net.

Hangar no. 12 – the scope of works specified in the contract included:

  • sanitary installations including air conditioning and mechanical ventilation,
  • electrical installations,
  • telecommunications installations.

and specialist works concerning technical and operational systems:

  • public address system,
  • fire alarm system (SAP),
  • structured cabling,
  • BMS system (automatic building control).

Connections were made to all the above systems.

The contract was completed in April 2013.

Ver outros projetos

+700 especialistas ao seu dispor!

  • Fornecedor líder de soluções abrangentes de informática, teletecnia, telecomunicações e energia
  • Atuamos em múltiplos setores, incluindo utilidade pública, administração do Estado, defesa nacional, energia, telecomunicações, negócios e engenharia do ambiente
  • Capacidade de conduzir projetos em grande escala, multinível e multifacetados
Contacte-nos
  • Fornecedor líder de soluções abrangentes de informática, teletecnia, telecomunicações e energia
  • Atuamos em múltiplos setores, incluindo utilidade pública, administração do Estado, defesa nacional, energia, telecomunicações, negócios e engenharia do ambiente
  • Capacidade de conduzir projetos em grande escala, multinível e multifacetados
Top